[8]M.K.Enns,J.J.Quada,B.Sackett.Fast Linear Contin-gency Analysis.IEEETransactions on Power Apparatus and System,1982,PAS-101(4):783~791. [9]Peter W.Sauer,Karl E.Reinhard,Thomas J.Overbye.Extended Factors for Linear Contingency Analysis.Proceed-ings ofthe 34th Hawaiiinternational conference on systemsci-ences-2001:697~703. [10]Ejebe G.C.,WaightJ.G.,Sanots-Nieto M.,Tinney W.F.Fast Calculation of Linear Available Transfer Capability. IEEETransactions on Power Systems,2000,15(3):1112~1116. [11]M.H.Gravener,C.Nwankpa.Availabletransfer capabilityand first order sensitivity.IEEE Transactions on Power Sys-tems,1999,14(2):512~518. [12]H.D.Chiang,A.Flueck,K.S.Shah,N.Balu.CP-FLOW:A practical tool for tracing power system steady-state stationary behavior due to load and generation varia-tions.IEEETransactions on Power Systems.1995,10(2):623~634. [13]A.J.Flueck,H.D.Chiang,K.S.Shah.Investigatingtheinstalled real power transfer capability of a large scale powersystemunder a proposed multiareainterchange schedule usingCPFLOW.IEEE Transactions on Power Systems,1996,11(2):883~889. [14]丁晓莺,王锡凡.最优潮流在电力市场环境下的最新发展[J].电力系统自动化,2002,26(13):1~7. [15]刁勤华,Mohamed Shaaban,倪以信.运用连续二次规划法计算区域间极限传输容量[J].电力系统自动化,2000,24(24):5~8. [16]Youjie Dai,J.D McCalley,V.Vittal.Simplification,Ex-pansion and Enhancement of Direct Interior Point Algorithm for Power System Maximum Loadability.IEEE Transactions on Power Systems,2000,15(3):1014~1021. [17]X.Luo,A.D.Patton,C.Singh.Real powertransfer ca-pability calculations using multi-layer feed-forward neuralnetworks.IEEE Transactions on Power Systems,2000,15(2):903~908. [18]焦连伟,Mohamed Shaaban,倪以信.可用传输容量计算的分层算法研究[J].中国电力,2002,35(1):33~36. [19]S.Greene,I.Dobson,F.L.Alvarado.Sensitivity ofTransfer Capability Margins with a Fast Formula.IEEETransactions on Power Systems,2002,17(1):34~40. (